What we build
Remodeling & construction services

From a single room to an ADU, concrete or a new pool: one contractor coordinating the work, start to finish.

Get a Free Estimate

Pool Construction in Cathedral City, CA

In the Coachella Valley, a pool is part of how you live. We plan the layout with your yard, sun and patio in mind, coordinate the specialty pool trades, and build the decking and hardscape around it.

Backyard swimming pool beside a modern single-story home

A pool planned around your yard and the desert sun

A pool in Cathedral City is used most of the year, so the details matter: where the afternoon shade falls, how the deck handles 110 degree days, where the equipment goes so you do not hear it from the patio. Mejia Construction plans pool projects with the whole backyard in mind and coordinates the specialty trades a pool needs, so you have one contractor tracking the schedule.

What a pool project includes

  • Layout and planning based on your yard, setbacks, access and how you want to use the space.
  • Excavation and steel for the pool shell.
  • Plumbing and equipment pad placed for service access and noise.
  • Shotcrete or gunite shell, then waterline tile and coping.
  • Concrete pool decks and walkways, finished to stay cooler underfoot.
  • Plaster and start-up, then the final walkthrough.
  • Safety features required by California, built in from day one.

How pool construction moves, stage by stage

  1. Design and permit. Layout, equipment location and safety features are drawn up and submitted for the building permit.
  2. Excavation. The yard is dug to the pool shape; soil is hauled off.
  3. Steel and plumbing. Rebar framework, then plumbing lines and the equipment pad.
  4. Shell. Shotcrete or gunite is sprayed and cured.
  5. Tile and coping. Waterline tile and the edge of the pool.
  6. Deck. Concrete deck formed, poured and finished.
  7. Plaster and start-up. Interior finish applied, pool filled and equipment started.

Each stage has inspections or curing time before the next one starts, which is why a realistic schedule matters more than a fast promise.

Pool safety in California

California’s Swimming Pool Safety Act requires a new pool at a single-family home to include at least two of seven drowning prevention safety features. Options include a fence or enclosure that isolates the pool from the house, a removable mesh fence, an approved safety cover, alarms on doors to the pool area and self-closing, self-latching devices. We help you choose the combination that fits your family and your yard.

Building pools in the Coachella Valley

Summer heat affects every outdoor trade. Concrete and plaster work goes early in the day, and fresh concrete is kept moist while it cures. Deck color matters too: lighter finishes reflect heat and stay more comfortable for bare feet. Many valley neighborhoods have HOAs that review pool plans and fencing, so we build that approval into the timeline. Finishing the backyard at the same time? Patios and walkways are part of our concrete work, and outdoor tile can tie the pool area to the house.

Pool Construction FAQ

Pool construction questions from valley homeowners

How long does it take to build a pool?

Most of the time goes into permits, then excavation, steel, plumbing, shell, tile and coping, decking and plaster. Each stage needs curing or inspection before the next one starts. We give you a written schedule once your design and permit are set.

What safety features does California require for a new pool?

Under California's Swimming Pool Safety Act, a new pool at a single-family home must have at least two of seven drowning prevention safety features, such as an enclosure that isolates the pool, alarms on doors or a safety cover. We plan these into the design from the start.

Do I need a permit to build a pool?

Yes. A new pool needs a building permit and inspections at several stages. The permit is applied for before excavation, and the contract should say in writing who obtains it. We plan the schedule around plan review and each inspection.

What pool deck stays cooler in the summer?

Light-colored concrete with a textured cool-deck coating is a common choice in the desert because it reflects more heat than dark pavers or stone. Our concrete page covers deck finishes in more detail.

When is the best time to build a pool in the Coachella Valley?

Starting in fall or winter means the pool is usually ready before the summer heat. Construction can happen year round, but summer pours and plaster work are scheduled for early morning hours to protect the finish.

Does my HOA need to approve the pool?

If your home is in a community with an HOA, it usually reviews pool plans, equipment placement and fencing. Getting HOA approval before the permit application avoids having to redraw plans later.

Often paired with

Related work for pool construction projects

Most projects touch more than one trade. These are the services that usually go with pool construction.

Pool Construction in Cathedral City, CA

Plan your backyard pool

Free on-site estimates Monday through Saturday, 8:00 AM to 5:00 PM. Call (760) 834-5089 or request a visit online.